State

Urban primary health centre to come up at Lumparing

Shillong, Dec 12: The health department has sanctioned Rs 4.99 crore for construction of a urban primary health centre at Lumparing.

South Shillong legislator Sanbor Shullai had recommended the project.

Advertisement

Shullai conducted a meeting cum joint inspection to speed up the construction of the project, on Tuesday.

Also present were District Medical and Health Officer DrĀ  Lyngdoh, the Executive Engineer of Health Wing R.A Wanniang, official of Health Department, the contractor and company Indira Slong, HB Wahlang Rangbah Shnong, Upper Lumparing, Doncaster Shabong Rangbah Shnong Lower Lumparing, Shaiphar Wahlang Rangbah Shnong, Riat-Laban-Kynjat Phutbol and all Rangbah Dongs of three Dorbar Shnong of Lumparing Pyllun (Greater Lumparing), Members of the Lumparing Sports Club and the residence of the area.

Shullai lauded the dorbar shnong of Lumparing and Lumparing Sports Club for donating the plot of land free of cost to the health department for implementation of such a very important project. He also assured that the construction of the health centre will be completed within 30 months.

Shullai said on completion, the project will benefit the people of greater Lumparing.

He also expressed gratitude to the MDA government under the leadership of ConradĀ  Sangma for sanctioning the project.

Related Articles

Back to top button
Close

Adblock Detected

Kindly Disable Ad Blocker